City of Mouriès – Water treatment plant


The Mouriès water treatment plant consists of:

  • An impermeable contact liner:

Diam: 8 m & Height: 3 m

  • A sludge storage tank:

Diam: 18 m & Height: 2.80 m

  • An aeration tank:

Diam: 18 m & Height: 2.80m

  • A clarification tank:

Diam: 16 m & Height: 2.20m

  • A degassing tank:

Dim: 3 m x 3 m & Height: 2.40m

MOURIES MOURIES 3

Client

LOGO MOURIES

Project Manager

BET Berim

Mission of Diades

DIADES carried out a detailed end-of-warranty inspection (the warranty being for a 10-year period) together with a specific analysis of the defects and an adhoc instrumentation. The client required DIADES’ expert assessment in order to decide how to deal with defects in the design and construction of the structure: as a result of the conclusions of the study, the Client issued a claim against the contractor in the Administrative Court within the time limit for bringing proceedings.

MOURIES 4

Download the project sheet