Detailed inspections carried out during the 2006 campaign revealed that two structures (the viaducts of Pala Nord and Sainte Agn\u00e8s Sud) presented structural defects. The ESTEREL, COTE D’AZUR, PROVENCE, ALPES motorways company (ESCOTA) wished to repair these two prestressed concrete structures as a matter of priority. Project management plans were carried out by EGIS JMI on the basis of the project management specifications drawn up by DIADES. The reinforcement works were carried out by the GTM-Freyssinet consortium.<\/p>\n
Diades assisted the Client by monitoring the plans for the repair and reinforcement of the prestressed caissons of the two viaducts:<\/p>\n Communication between Client Assistant (AMO<\/em>), Project Manager (MOE<\/em>) and the Client (MOA<\/em>) enabled the design to be perfected as the studies progressed.<\/p>\n Download the project sheet <\/a><\/p>\n","protected":false},"excerpt":{"rendered":" Detailed inspections carried out during the 2006 campaign revealed that two structures (the viaducts of Pala Nord and Sainte Agn\u00e8s Sud) presented structural defects. The ESTEREL, COTE D’AZUR, PROVENCE, ALPES motorways company (ESCOTA) wished to repair these two prestressed concrete…<\/a><\/p>\n
Client<\/h3>\n
<\/a><\/p>\n
Project Manager<\/h3>\n
<\/a><\/p>\n
Features<\/h3>\n
\n
Mission of Diades<\/h3>\n
<\/a><\/p>\n
\n
Read More<\/a><\/p>\n","protected":false},"author":7,"featured_media":4328,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[190,243],"tags":[],"class_list":["post-2224","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-achievements","category-consultancy-advice-research-training"],"acf":[],"yoast_head":"\n